Technical Information

Page:   1   2   3   4   5   6   7   8   9   10   11   12




All the gauges are slipped through the openings from the front side of the panel. The retainer is then installed on the gauge and the nuts screwed on to secure the gauge.



The final step is to attach the wiring and mount the new cluster into the dash. Re-attach the column and lower piece of the fiberglass panel. Now you can re-connect the battery and verify that all the gauges are working properly.
Page:   1   2   3   4   5   6   7   8   9   10   11   12